College Solar G99 Connections with SPEN

G99 grid connection guide for FE college solar projects in SPEN's territory: Glasgow, Edinburgh, Lothians, Borders, Dumfries & Galloway, Argyll & Bute (parts).

What does a SPEN G99 college solar connection typically involve?
SPEN covers Central and Southern Scotland. A G99 application and DNO approval are needed before connecting systems above 16 A per phase. Timescales, application fees and any network study charges are set and published by the DNO, so check ScottishPower Energy Networks (SPEN)'s current connection guidance and charging statement before programming the project.
Region
Central and Southern Scotland
Timescales
See the DNO published guidance
Application fee
Set by the DNO
Network study
Where the DNO requires one

What's distinctive about SPEN

For FE college solar projects in Central and Southern Scotland, three planning points apply: (1) start the G99 application early, because the DNO timeline is usually the critical-path item; (2) allow for any network study cost in the funding calculation where the DNO requires one; (3) prepare the protection and anti-islanding documentation with the design package, which makes the first technical response easier.

Practical tips for SPEN college solar applications

SP Energy Networks publishes connection guidance for its Scottish territory; check it directly. The Scottish Salix loan scheme is open in 2026.

FE colleges in SPEN territory

For orientation only, FE colleges in this territory include the following. This is not a list of clients or completed projects:

Project sequencing with SPEN

  1. Pre-application: a conversation with SPEN is recommended for larger installs; confirm the point of connection and the electrical design baseline.
  2. Application: submit the G99 application with the full design package (single-line diagram, protection scheme, anti-islanding documentation, inverter specification).
  3. Technical review: SPEN reviews the application and raises clarifications, which should be answered promptly.
  4. Network study and connection agreement: where the DNO requires a study, then the connection agreement is issued.
  5. Build phase: per the project programme, with physical install scheduled into the summer break window.
  6. Commissioning: DNO witness testing, arranged after physical commissioning.

Related guides

What to check when you choose an installer

  • MCS certification (check the MCS register)
  • NICEIC or equivalent electrical registration
  • Insurance-backed workmanship warranty
  • Consumer-code membership where it applies
  • ISO 9001 / 14001 management systems

Send an enquiry · we reply by email

Tell us about your college

Tell us about your institution and we reply by email with the funding routes that look relevant for your nation and an indicative system size worked from your electricity spend. It is a desk exercise from what you send, so no site visit is needed to start. For what is open and closed by nation, with sources and dates, see the funding status on the grants and funding page.

What we won't do: add you to marketing lists or share your details without asking you first.

Why we ask what we ask: your nation, spend and postcode set which schemes apply and the indicative system size, and the building and timeline tell us what to look at first. We are an independent advisory, not an installer.