What's distinctive about SPEN
For FE college solar projects in Central and Southern Scotland, three planning points apply: (1) start the G99 application early, because the DNO timeline is usually the critical-path item; (2) allow for any network study cost in the funding calculation where the DNO requires one; (3) prepare the protection and anti-islanding documentation with the design package, which makes the first technical response easier.
Practical tips for SPEN college solar applications
SP Energy Networks publishes connection guidance for its Scottish territory; check it directly. The Scottish Salix loan scheme is open in 2026.
FE colleges in SPEN territory
For orientation only, FE colleges in this territory include the following. This is not a list of clients or completed projects:
- City of Glasgow College
- Glasgow Clyde College
- Glasgow Kelvin College
- Edinburgh College
- West Lothian College
- New College Lanarkshire
- South Lanarkshire College
- West College Scotland
- Fife College
- Forth Valley College
- Borders College
- Dumfries and Galloway College
- SRUC (Auchincruive, Edinburgh, Dumfries)
Project sequencing with SPEN
- Pre-application: a conversation with SPEN is recommended for larger installs; confirm the point of connection and the electrical design baseline.
- Application: submit the G99 application with the full design package (single-line diagram, protection scheme, anti-islanding documentation, inverter specification).
- Technical review: SPEN reviews the application and raises clarifications, which should be answered promptly.
- Network study and connection agreement: where the DNO requires a study, then the connection agreement is issued.
- Build phase: per the project programme, with physical install scheduled into the summer break window.
- Commissioning: DNO witness testing, arranged after physical commissioning.