NAMED COLLEGE ASSESSMENT

Solar Panels for LTE Group (The Manchester College, UCEN Manchester, MOL, Total People)

Estate opportunity assessment, funding stack, and system sizing for LTE Group. Greater Manchester FE group.

Discuss a LTE Group project →
Estate-specificFunding-mappedDNO-aware
What's the solar opportunity at LTE Group (The Manchester College, UCEN Manchester, MOL, Total People)?
LTE Group (The Manchester College, UCEN Manchester, MOL, Total People) operates from Greater Manchester (6 campuses) as a Greater Manchester FE group with 52,000+ across the group. Estate: The Manchester College: Northenden, Openshaw, Harpurhey, City Centre (Shena Simon), Wythenshawe, Nicholls. Combined building footprint ~26,000 sqm. Mixed-age estate from 1960s teaching blocks to 2018 City Campus Manchester (new build). The combined buildings support a 2.0-2.5 MW solar PV programme, with self-consumption typically around 70% driven by 950 kW daytime baseload. DNO is Electricity North West (ENW). Single portfolio Salix bid covering all Manchester College campuses.
Category
Greater Manchester FE group
Location
Greater Manchester
DNO
Electricity North West (ENW)
Est. PV capacity
2.0-2.5 MW
2250 kW
Est. PV potential
Across full estate
📊
950 kW
Daytime baseload
Self-consumption driver
🔋
70%
Modelled self-consumption
At full PV capacity
☀️
1395
Annual sunshine hours
Greater Manchester catchment

About LTE Group (The Manchester College, UCEN Manchester, MOL, Total People)

LTE Group includes The Manchester College plus UCEN Manchester (HE-in-FE), MOL (apprenticeship training), Total People (apprenticeship). Largest FE provider in Greater Manchester. Group sustainability lead in post.

The estate at LTE Group

The Manchester College: Northenden, Openshaw, Harpurhey, City Centre (Shena Simon), Wythenshawe, Nicholls. Combined building footprint ~26,000 sqm. Mixed-age estate from 1960s teaching blocks to 2018 City Campus Manchester (new build).

From a solar PV perspective this delivers 2.0-2.5 MW across the Greater Manchester portfolio. With 950 kW of daytime baseload typical, self-consumption stays around 70% — strong for the sector. The DNO for LTE Group is Electricity North West (ENW).

Curriculum integration

T-Level Construction, Engineering, Digital, Building Services Engineering delivered across campuses. Live-generation data integrates directly with T-Level Green Skills requirements.

Funding stack for LTE Group

Single portfolio Salix bid covering all Manchester College campuses. GMCA Public Sector Decarbonisation Pot accessible across all 6 sites. PSDS Phase 4 bundled bid for largest campuses. Estimated portfolio capex £1.8m-£2.2m.

Detailed funding-route deep-dives:

Estimated economics

For a 2250 kW programme at LTE Group, modelled economics assuming standard portfolio-scale unit cost (£800/kW installed at this scale):

These are scoping figures — a precise feasibility report requires 12 months of LTE Group's half-hourly meter data. See our interactive payback calculator to adjust the assumptions for your specific scenario.

Related guides

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001

Commercial Solar Across the UK

For MAT and maintained school solar see solar panels for schools.

For nursing and care home solar see solar panels for care homes.

For NHS trust solar see solar panels for hospitals.

For PCC and diocesan solar see solar panels for churches.

For the UK commercial solar hub visit commercial solar installation.

For UK business solar grants see solar panel grants for businesses.