NAMED COLLEGE ASSESSMENT

Solar Panels for NCG (Newcastle College Group)

Estate opportunity assessment, funding stack, and system sizing for NCG. Multi-region FE group.

Discuss a NCG project →
Estate-specificFunding-mappedDNO-aware
What's the solar opportunity at NCG (Newcastle College Group)?
NCG (Newcastle College Group) operates from Newcastle upon Tyne (head office) + 6 campuses nationally as a Multi-region FE group with 38,000+ nationally. Estate: 7-campus portfolio: Newcastle College (Rye Hill, Parsons, Sandyford, Carliol Square), Lewisham Southwark, West Lancashire, Carlisle, Kidderminster, Trafford, plus NCG National Online. Combined ~28,000 sqm building footprint. The combined buildings support a 2.5-3 MW solar PV programme, with self-consumption typically around 68% driven by 1100 kW daytime baseload. DNO is Multiple — NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire). Single portfolio Salix Decarbonisation Loan application supported by Salix.
Category
Multi-region FE group
Location
Newcastle upon Tyne
DNO
Multiple — NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire)
Est. PV capacity
2.5-3 MW
2750 kW
Est. PV potential
Across full estate
📊
1100 kW
Daytime baseload
Self-consumption driver
🔋
68%
Modelled self-consumption
At full PV capacity
☀️
1380
Annual sunshine hours
Newcastle upon Tyne catchment

About NCG (Newcastle College Group)

Largest multi-region FE corporation in the UK by campus count. Group Sustainability Strategy 2024-30 committed to scope-2 net zero by 2030 with rooftop solar as headline intervention. Distinctive: campuses sit inside 5 different DNO territories.

The estate at NCG

7-campus portfolio: Newcastle College (Rye Hill, Parsons, Sandyford, Carliol Square), Lewisham Southwark, West Lancashire, Carlisle, Kidderminster, Trafford, plus NCG National Online. Combined ~28,000 sqm building footprint.

From a solar PV perspective this delivers 2.5-3 MW total across the multi-region portfolio. With 1100 kW of daytime baseload typical, self-consumption stays around 68% — strong for the sector. The DNO for NCG is Multiple — NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire).

Curriculum integration

T-Level Construction, T-Level Building Services Engineering, T-Level Engineering across multiple campuses. Cross-region curriculum coordination already established — single sustainability programme can roll out to all sites.

Funding stack for NCG

Single portfolio Salix Decarbonisation Loan application supported by Salix. PSDS Phase 4 bundled bid for largest 2-3 campuses. Multiple MCA grants accessible per campus (NECA, WMCA, GLA, GMCA). Estimated portfolio capex £2.1m-£2.6m.

Detailed funding-route deep-dives:

Estimated economics

For a 2750 kW programme at NCG, modelled economics assuming standard portfolio-scale unit cost (£800/kW installed at this scale):

These are scoping figures — a precise feasibility report requires 12 months of NCG's half-hourly meter data. See our interactive payback calculator to adjust the assumptions for your specific scenario.

Related guides

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001

Commercial Solar Across the UK

For MAT and maintained school solar see solar panels for schools.

For nursing and care home solar see solar panels for care homes.

For NHS trust solar see solar panels for hospitals.

For PCC and diocesan solar see solar panels for churches.

For the UK commercial solar hub visit commercial solar installation.

For UK business solar grants see solar panel grants for businesses.