- Category
- General FE college (NCG group member)
- Location
- Lewisham + Southwark, South London
- DNO
- NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire)
- Est. PV capacity
- 1.0-1.2 MW
About Lewisham College (part of NCG)
Lewisham College (Lewisham Southwark College) operates as part of NCG (Newcastle College Group) — multi-region FE corporation. Single group Salix bid covers all NCG campuses including Lewisham + Southwark + Waterloo.
The estate at Lewisham
Lewisham Way main campus + Southwark Campus (Bermondsey) + Waterloo Centre. Combined ~12,000 sqm.
From a solar PV perspective this delivers 1.0-1.2 MW across the portfolio. With 290 kW of daytime baseload typical, self-consumption stays around 66% — strong for the sector. The DNO for Lewisham is NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire).
Curriculum integration
T-Level Construction, Engineering, Digital, Health, Hospitality. Part of NCG national group enabling portfolio-wide Salix bid.
Funding stack for Lewisham
NCG group-wide Salix Decarbonisation Loan + GLA decarbonisation + PSDS Phase 4 bundled across the South London campuses. Estimated South London portfolio capex £950k-£1.15m within wider NCG £2.1m-£2.6m programme.
Detailed funding-route deep-dives:
- Salix Decarbonisation Loan — interest-free up to £600k per project
- PSDS Phase 4 capital grant — 100% grant for bundled bids
- FE Capital Transformation Fund — embedded sustainability in major refurb
- MCA decarbonisation grants — devolved regional funding
Estimated economics
For a 1100 kW programme at Lewisham, modelled economics assuming standard portfolio-scale unit cost (£800/kW installed at this scale):
- Capital cost: approximately £880,000
- Annual generation: approximately 1,652,596 kWh
- Annual energy savings: approximately £317,628 (at typical FE blended tariff)
- Salix-funded payback: approximately 2.8 years
- 25-year nominal benefit: approximately £7,060,700
These are scoping figures — a precise feasibility report requires 12 months of Lewisham's half-hourly meter data. See our interactive payback calculator to adjust the assumptions for your specific scenario.