- Category
- General FE college (NCG group member)
- Location
- Lewisham + Southwark, South London
- DNO
- NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire)
- Est. PV capacity
- 1.0-1.2 MW
About Lewisham College (part of NCG)
Lewisham College (Lewisham Southwark College) operates as part of NCG (Newcastle College Group) — multi-region FE corporation. Single group Salix bid covers all NCG campuses including Lewisham + Southwark + Waterloo.
The estate at Lewisham
Lewisham Way main campus + Southwark Campus (Bermondsey) + Waterloo Centre. Combined ~12,000 sqm.
From a solar PV perspective this delivers 1.0-1.2 MW across the portfolio. With 290 kW of daytime baseload typical, self-consumption stays around 66% — strong for the sector. The DNO for Lewisham is NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire).
Curriculum integration
T-Level Construction, Engineering, Digital, Health, Hospitality. Part of NCG national group enabling portfolio-wide Salix bid.
Funding stack for Lewisham
The routes that apply depend on the nation and on scheme status, set out below (read 31 October 2026; no Salix scheme is open for England).
Detailed funding-route deep-dives:
- Salix Decarbonisation Loan — Salix has no scheme open for England (checked 20 October 2026); Scottish and Welsh loans are open
- MCA decarbonisation grants — devolved regional funding
- AoC Climate Action Roadmap implementation — board-approved Climate Action Plan compliance pathway
- November 2022 ONS reclassification — the November 2022 reclassification of FE colleges into central government
- Interactive payback model — model the specific Lewisham College (part of NCG) scenario
Closed or not a solar route: PSDS Phase 4 closed to new applications in November 2024 and GOV.UK lists no successor (status); the FE Capital Transformation Programme has completed all its funding rounds (status).
Estimated economics (illustrative model)
For a 1100 kW programme at Lewisham, modelled economics assuming standard portfolio-scale unit cost (£800/kW installed at this scale):
- Capital cost: approximately £880,000
- Annual generation: approximately 1,113,706 kWh
- Annual energy savings: approximately £214,053 (at typical FE blended tariff)
- Modelled simple payback (illustrative, before any funding): approximately 4.1 years
- 25-year nominal net benefit (before degradation and inflation): approximately £4,471,325
These are scoping figures — a precise feasibility report requires 12 months of Lewisham's half-hourly meter data. See our interactive payback calculator to adjust the assumptions for your specific scenario.