- Category
- General FE college
- Location
- Croydon, South London
- DNO
- NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire)
- Est. PV capacity
- 850 kW
About Croydon College
Croydon College serves a high-deprivation South London catchment with substantial T-Level + apprenticeship throughput. GLA Mayor of London Net Zero by 2030 framework applies; Croydon Council climate strategy adds funding routes.
The estate at Croydon
Croydon Town Centre main campus + University Centre Croydon (HE-in-FE) + Construction Skills Centre at Coombe Lane. Combined ~9,800 sqm.
From a solar PV perspective this delivers 850 kW - 1.0 MW across the portfolio. With 240 kW of daytime baseload typical, self-consumption stays around 64% — strong for the sector. The DNO for Croydon is NPg (Newcastle, Carlisle), UKPN (Lewisham, Southwark), ENW (Trafford), NGED (Kidderminster), SPM (West Lancashire).
Curriculum integration
T-Level Construction, Engineering, Digital, Building Services. Strong widening-participation agenda; HE-in-FE pathway to University Centre Croydon.
Funding stack for Croydon
The routes that apply depend on the nation and on scheme status, set out below (read 31 October 2026; no Salix scheme is open for England). Estimated portfolio capex £820k-£1.0m (a modelled figure from building type, not from the college's own data).
Detailed funding-route deep-dives:
- Salix Decarbonisation Loan — Salix has no scheme open for England (checked 20 October 2026); Scottish and Welsh loans are open
- MCA decarbonisation grants — devolved regional funding
- AoC Climate Action Roadmap — board-approved Climate Action Plan compliance pathway
- ONS reclassification — what it changed for FE colleges — the November 2022 reclassification of FE colleges into central government
- Solar payback calculator for Croydon College colleges — model the specific Croydon College scenario
Closed or not a solar route: PSDS Phase 4 closed to new applications in November 2024 and GOV.UK lists no successor (status); the FE Capital Transformation Programme has completed all its funding rounds (status).
Estimated economics (illustrative model)
For a 425500 kW programme at Croydon, modelled economics assuming standard portfolio-scale unit cost (£800/kW installed at this scale):
- Capital cost: approximately £340,400,000
- Annual generation: approximately 430,801,730 kWh
- Annual energy savings: approximately £81,335,366 (at typical FE blended tariff)
- Modelled simple payback (illustrative, before any funding): approximately 4.2 years
- 25-year nominal net benefit (before degradation and inflation): approximately £1,692,984,150
These are scoping figures — a precise feasibility report requires 12 months of Croydon's half-hourly meter data. See our interactive payback calculator to adjust the assumptions for your specific scenario.