NAMED COLLEGE ASSESSMENT

Solar Panels for Coleg Cambria

Estate opportunity assessment, funding stack, and system sizing for Coleg Cambria. North Wales multi-site FE.

Discuss a Coleg Cambria project →
Estate-specificFunding-mappedDNO-aware
What's the solar opportunity at Coleg Cambria?
Coleg Cambria operates from Wrexham, Deeside, Denbighshire (Llysfasi), Northop, Yale as a North Wales multi-site FE with 21,000+ across North Wales. Estate: 5-campus portfolio: Yale (Wrexham), Deeside, Llysfasi (Denbighshire land-based), Northop, Yale community sites. Llysfasi has 525-hectare working farm estate. The combined buildings support a 1.5-2 MW solar PV programme, with self-consumption typically around 72% driven by 540 kW daytime baseload. DNO is SP Manweb. Welsh Government Energy Service feasibility funding + Salix Decarbonisation Loan + Welsh Government Net Zero Wales Public Sector Capital + North Wales Growth Deal decarbonisation.
Category
North Wales multi-site FE
Location
Wrexham, Deeside, Denbighshire
DNO
SP Manweb
Est. PV capacity
1.5-2 MW
1750 kW
Est. PV potential
Across full estate
📊
540 kW
Daytime baseload
Self-consumption driver
🔋
72%
Modelled self-consumption
At full PV capacity
☀️
1450
Annual sunshine hours
Wrexham, Deeside, Denbighshire catchment

About Coleg Cambria

Largest FE provider in North Wales. Welsh Government Net Zero Wales 2030 public sector target applies. Welsh Government Energy Service for Colleges provides technical and bid support not available to English colleges.

The estate at Coleg Cambria

5-campus portfolio: Yale (Wrexham), Deeside, Llysfasi (Denbighshire land-based), Northop, Yale community sites. Llysfasi has 525-hectare working farm estate.

From a solar PV perspective this delivers 1.5-2 MW including Llysfasi agricultural estate. With 540 kW of daytime baseload typical, self-consumption stays around 72% — strong for the sector. The DNO for Coleg Cambria is SP Manweb.

Curriculum integration

T-Level Agriculture (Llysfasi), Welsh-medium delivery, BSc Agriculture (HE-in-FE), apprenticeships across all sites. Welsh language signage and curriculum requirements integrated.

Funding stack for Coleg Cambria

Welsh Government Energy Service feasibility funding + Salix Decarbonisation Loan + Welsh Government Net Zero Wales Public Sector Capital + North Wales Growth Deal decarbonisation. Estimated portfolio capex £1.3m-£1.7m.

Detailed funding-route deep-dives:

Estimated economics

For a 1750 kW programme at Coleg Cambria, modelled economics assuming standard portfolio-scale unit cost (£800/kW installed at this scale):

These are scoping figures — a precise feasibility report requires 12 months of Coleg Cambria's half-hourly meter data. See our interactive payback calculator to adjust the assumptions for your specific scenario.

Related guides

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001

Commercial Solar Across the UK

For MAT and maintained school solar see solar panels for schools.

For nursing and care home solar see solar panels for care homes.

For NHS trust solar see solar panels for hospitals.

For PCC and diocesan solar see solar panels for churches.

For the UK commercial solar hub visit commercial solar installation.

For UK business solar grants see solar panel grants for businesses.